IOT Reading College

Refurbishment and remodelling works to the East Wing, Institute of Technology at Reading College.

PROJECT OVERVIEW

Client: MK College Group
Contract Value: £600,000
Duration: 10 Weeks
Contract Type: IFC 16 WCD

PROJECT OVERVIEW

We refurbished and remodelled the East Wing (the Institute of Technology) at Reading College. Works included the refurbishment of six existing teaching rooms (Third Floor of the East Wing), to create a more modern, quality Higher Education IT teaching space.

Key Points:

  • Non-notifiable asbestos removal

  • Load-bearing and non-load-bearing demolition

  • Installation of new mechanical and electrical services, including a state-of-the-art A/V system

  • Creation of new roof penetrations

  • Installation of new specialist ceiling systems, doors, screens, partitions and non-load-bearing walls

  • Full decoration throughout

  • Sustainable heating system and LED lighting replaced throughout